In-row CDU 1.4–2.6 MW

1.38 to 2.6 MW in a 1.2 m square footprint. Full N+1 redundancy for in-row, white-space or mechanical-gallery installation.

In-row CDU 1.4–2.6 MW
2.6MWHeat transfer, maximum
3°CApproach
3,870L/minMaximum flow
1.2mSquare footprint
Overview

Designed for the AI hall.

N+1 throughout

Pumps, controllers, sensors, filters and drives, with N+1 modular heat exchangers.

Warm water

Designed around 45 °C warm-water cooling with a 3 °C approach.

Fits the build

Connections at the top or through the floor, for new halls and retrofits.

Group control

12-inch HMI for local operation, remote monitoring and coordinated group control.

Specifications

Technical data.

Request full datasheet
Performance
Heat transfer
1,380–2,600 kW
Approach
3 °C (AT3)
Design point
45 °C warm-water cooling
Hydraulics
Flow
Up to 3,870 L/min
Redundancy
N+1 pumps, controllers, sensors, filters and drives
Heat exchangers
N+1 modular
Connections
Top or technical floor
Electrical
Supply
3 × 380–480 V AC, 50/60 Hz
Consumption
27–31.5 kW, N+1 pumps
Physical
L × W × H
1,200 × 1,200 × 2,400 mm
Weight
1,280 kg transport, 1,680 kg filled
Location
In-row, white space or mechanical gallery
Controls
Interface
12-inch HMI, remote monitoring, group control
Reporting
Historical trends, alarms, equipment sequencing
Protocols
BACnet, Modbus, OPC UA, SNMP, PROFINET
Water quality
Monitored
pH, conductivity, turbidity, glycol concentration, corrosion rate, temperature
Treatment
Chemical dosing and pH regulation built in

Figures are manufacturer nominal values. Final selection and performance are confirmed against your design conditions.

Supplied by SI

The unit, and everything around it.

01Selection and sizing

Against your rack density, approach temperature and site.

02Installation

Set in place, piped, insulated and clad by our crew.

03Flush and fill

The loop behind it cleaned, filled with PG25 and certified.

04Commissioning

One record for unit, loop and fluid.

05Service

Sampling, top-up and support for the life of the loop.

Talk to us early

Specifying a hall?

Send us the load, the approach and the site. We come back with a selection within one business day.

  1. 01At design

    The commissioning scope is right before the specification goes out.

  2. 02In construction

    The flush and fill is programmed off the critical path.

  3. 03At handover

    One certificate. The baseline you keep.