Every megawatt
has a loop.
AI halls are liquid-cooled. Every loop is filled once and sealed, and what is left inside it stays there.
Built for the AI hall.
Air cooling reaches its limit around 30 kW per rack. AI halls are designed well above that. Singapore published a national liquid-cooling standard in August 2026, SS 726:2026, covering commissioning, fluids and maintenance. Australian specifications are heading the same way.
- Hyperscale and colocation operators
- Mechanical contractors and builders
- Commissioning managers and consulting engineers

Services and products.
Flush and fill
Clean, filled and certified before IT load.
Explore →
CDU supply and commissioning
Unit, loop and fluid handed over by one crew.
Explore →
PG25 coolant supply
Drums, IBCs and ISO tanks, filled by our crew.
Explore →
TCS loop package
Everything between the CDU and the rack, as one scope.
Explore →
CDUs and heat rejection
In-row and facility CDUs to 8.15 MW, and dry coolers.
Explore →
Fuel polishing skid
Standby diesel kept in specification, and logged.
Explore →Data centre developments.
Data centresAnthropic anchors a 1.44 GW campus in Queensland’s Western Downs
The Queensland Premier announced the AI company’s first Australian data centre agreement, at a 725-hectare site north-west of Dalby.
Read the briefing →
Data centres27 approved AI data centres sit outside proposed new rules
An ABC analysis counts at least 3.38 GW of approved but unbuilt data centre capacity, while Canberra prepares energy and water conditions for future projects.
Read the briefing →
Data centresSingapore publishes SS 726:2026 for liquid cooling
Enterprise Singapore has launched what it describes as the world’s first liquid-cooling standard for data centres in tropical climates.
Read the briefing →The AI build-out, at scale.
Hyperscale campuses under construction and in service across the United States. Every hall on sites like these runs on liquid-cooled loops.
Videos play from YouTube and remain the property of their publishers.
Have a loop to commission?
Tell us the loop and the date. We come back within one business day.
- 01At design
The commissioning scope is right before the specification goes out.
- 02In construction
The flush and fill is programmed off the critical path.
- 03At handover
One certificate. The baseline you keep.