Pre-commissioning cleaning and fill for technology cooling and facility loops, quoted as one scope and handed over with one certificate.

Overview

The last step
before IT load.

Whatever is left in a loop ends up in cold plates and CDU strainers. Our process removes what a conventional flush leaves behind, within the pipework’s pressure rating, with heat exchangers cleaned in place. Then the loop is filled, verified and sealed.

  • Technology cooling and facility loops
  • Cleanliness and fluid condition verified by instrument
  • PG25 supplied and filled from drum, IBC or ISO tank
  • Flush and fill quoted as one scope
  • Sampling and top-up for the life of the loop
What you get

The flush is the last step before IT load goes on. It should not be the step that delays it.

01

Measured

Cleanliness is a number on a certificate, not the colour of the water.

02

One scope

No gap between the flush contractor and the fill.

03

A baseline

The record every later question about the loop refers back to.

Talk to us early

Have a loop to commission?

Tell us the loop and the date. We come back within one business day.

  1. 01At design

    The commissioning scope is right before the specification goes out.

  2. 02In construction

    The flush and fill is programmed off the critical path.

  3. 03At handover

    One certificate. The baseline you keep.