The complete loop,
as one package.

Everything between the distribution unit and the rack, specified as one scope and built from components chosen to work with our process.

P1

TCS loop package

Supplied and specified as one scope. Specified once, used on every hall built to that standard. No substitutions without written agreement.

Pipework
Pipe, fittings, valves and manifolds to the loop specification
Monitoring
The instrumentation the loop needs to report its own condition
Plant
The equipment that keeps a sealed loop stable for its service life
Origin
Selected manufacturers. Names under agreement.
P2

CDUs and heat rejection

Supplied, installed and commissioned by the same crew that cleans and fills the loop.

Range
Rack-row distribution units to multi-megawatt facility units
Rejection
Dry, adiabatic and hybrid coolers for sealed loops
Sizing
Against your rack density and approach temperature
Service
One commissioning record for unit, loop and fluid
P3

Fuel polishing skid

Keeps standby-generator diesel within specification, and keeps the record that proves it. A visiting cart cannot produce a continuous record. A fixed unit can.

Format
Factory-built skid in defined sizes
Duty
Full tank turnover on a published duty cycle
Record
Fuel condition logged continuously
Design
Serviceable without shutting the system down