P1TCS loop package
Supplied and specified as one scope. Specified once, used on every hall built to that standard. No substitutions without written agreement.
- Pipework
- Pipe, fittings, valves and manifolds to the loop specification
- Monitoring
- The instrumentation the loop needs to report its own condition
- Plant
- The equipment that keeps a sealed loop stable for its service life
- Origin
- Selected manufacturers. Names under agreement.
P2CDUs and heat rejection
Supplied, installed and commissioned by the same crew that cleans and fills the loop.
- Range
- Rack-row distribution units to multi-megawatt facility units
- Rejection
- Dry, adiabatic and hybrid coolers for sealed loops
- Sizing
- Against your rack density and approach temperature
- Service
- One commissioning record for unit, loop and fluid
P3Fuel polishing skid
Keeps standby-generator diesel within specification, and keeps the record that proves it. A visiting cart cannot produce a continuous record. A fixed unit can.
- Format
- Factory-built skid in defined sizes
- Duty
- Full tank turnover on a published duty cycle
- Record
- Fuel condition logged continuously
- Design
- Serviceable without shutting the system down