Data centre campuses under construction, plant on the roof, racks in the hall, and the Defence platforms the same standard applies to.

Photographs

From the ground and the air.

Hyperscale AI campus under constructionAbilene, Texas
Precast halls going up, steel on the roofNorthern Virginia, USA
Data centre build, aerialArtarmon, Sydney
Precast panel liftArtarmon, Sydney
Site works with the city behindArtarmon, Sydney
Rooftop plant across a liquid-cooled hallSydney
Campus and plant deck from the airSydney
Chillers and heat rejection, rooftopSydney
Facade and plant screensSydney
Heat rejection being setSydney
Generator row and fluesSydney
Racks cabled and ready for loadData hall
Loop pipework, insulated and cladData hall
Distribution pipework overheadData hall
Coolant distribution, in-rowData hall
Submarine undocking, scheduled maintenancePearl Harbor
Floating dry dockSubmarine base
Shipyard and dry dockNaval shipyard
Frigate under wayAt sea
Sydney, home baseSydney Harbour
On film

The AI build-out, at scale.

Hyperscale campuses under construction and in service across the United States. Every hall on sites like these runs on liquid-cooled loops.

Videos play from YouTube and remain the property of their publishers.

Photography: SI Critical Systems and partners; NEXTDC series by Chris Cook, used with permission; Goodman SYD01 series, used with permission. Some images are used under licence: dry coolers by Nico aspe 22 (CC BY-SA 4.0); petrochemical plant, Cologne, by CEphoto, Uwe Aranas (CC BY-SA 3.0); industrial storage tanks by Cjp24 (CC BY-SA 3.0); standby generators by PEO ACWA (CC BY 2.0); US Navy and US Department of Energy photographs, public domain. Images of third-party facilities are shown as industry context and do not imply a client relationship.

Talk to us early

Want to see our own work?

Site photography and method demonstrations are shared under agreement. Ask us.

  1. 01At design

    The commissioning scope is right before the specification goes out.

  2. 02In construction

    The flush and fill is programmed off the critical path.

  3. 03At handover

    One certificate. The baseline you keep.