Services CDU supply and commissioning

Unit and loop.
One record.

Coolant distribution units selected, installed and commissioned, with the loop behind them cleaned and filled by the same crew.

Overview

Sized for the rack,
commissioned with the loop.

CDUs sized against rack density and approach temperature, from in-row units to 8 MW facility units. Commissioned together with the loop, so unit, loop and fluid share one record.

  • Sizing against rack density and approach temperature
  • In-row and facility units, 1.38 to 8.15 MW
  • Our crew, or managed subcontract
  • Australian-built switchboards where changes are needed
What you get

Measured. Recorded.
Handed over.

01

One handover

Unit, loop and fluid commissioned together.

02

Right-sized

Selected against your load, not a catalogue.

03

Supported

Sampling and service for the life of the loop.

Talk to us early

Have a loop to commission?

Tell us the loop and the date. We come back within one business day.

  1. 01At design

    The commissioning scope is right before the specification goes out.

  2. 02In construction

    The flush and fill is programmed off the critical path.

  3. 03At handover

    One certificate. The baseline you keep.