Products

The complete loop,
as one package.

Equipment specified once and supplied with the service behind it. Selected European manufacturers. Names under agreement.

8 MW facility coolant distribution unit
P1

CDUs and heat rejection

In-row and facility coolant distribution units from 1.38 to 8.15 MW, and 2 MW dry coolers. Supplied, installed and commissioned by the crew that fills the loop.

  • Facility CDU 8 MW · 2 °C approach
  • Facility CDU 5 MW · AT4 to AT2
  • In-row CDU 1.4–2.6 MW · 1.2 m footprint
  • Dry cooler 2 MW · water-free
View the range
In-row cooling between server racks
P2

TCS loop package

Everything between the distribution unit and the rack, specified once and used on every hall built to that standard. No substitutions without written agreement.

  • Pipe, fittings, valves and manifolds
  • Instrumentation that reports the loop’s condition
  • Plant that keeps a sealed loop stable
  • Selected European manufacturers
Explore
Coolant make-up and dosing plant
P3

PG25 coolant supply

Pre-mixed inhibited propylene glycol, matched to the fluid your CDU and cold-plate makers approve. Delivered, decanted into the loop and certified by batch.

  • Drums, 1,000 L IBCs and ISO tank containers
  • Certificate of analysis with every batch
  • Top-up stock and empty IBC return
  • Filled by the crew that cleaned the loop
Explore
Standby diesel generators
P4

Fuel polishing skid

A fixed, factory-built skid that keeps standby-generator diesel within specification on a published duty cycle, and keeps the record that proves it.

  • Full tank turnover on a published duty cycle
  • Fuel condition logged continuously
  • Serviceable without shutting the system down
  • Data centres, bases and critical sites
Explore
Supplied by SI

The unit, and everything around it.

01Selection and sizing

Against your rack density, approach temperature and site.

02Installation

Set in place, piped, insulated and clad by our crew.

03Flush and fill

The loop behind it cleaned, filled with PG25 and certified.

04Commissioning

One record for unit, loop and fluid.

05Service

Sampling, top-up and support for the life of the loop.

Talk to us early

Need datasheets?

Tell us the project and we will send what fits it.

  1. 01At design

    The commissioning scope is right before the specification goes out.

  2. 02In construction

    The flush and fill is programmed off the critical path.

  3. 03At handover

    One certificate. The baseline you keep.