Markets

Two markets.
One standard.

The physics that clears a chip-level cooling loop clears a ship’s seawater system. The standard we hand over to is the same.

Data centre construction site
Market 01

Data centres

Every liquid-cooled megawatt has a loop that must be clean before the fluid goes in.

Naval frigate at sea
Market 02

Defence

Fleet, bases and secure compute. Systems returned to service, documented.

Talk to us early

Talk to us about your loop.

Data centre or Defence, the first conversation is the same: the system, the date, the specification.

  1. 01At design

    The commissioning scope is right before the specification goes out.

  2. 02In construction

    The flush and fill is programmed off the critical path.

  3. 03At handover

    One certificate. The baseline you keep.